New 46kV SF6 breaker and equipment for interconnection w PacifiCorp. Clear site, install new grounding grid, fabrication of steel structure, concre…
Brush clearing along utility easement on Santa Rosa Band of Cahuilla Indian Reservation, totaling 33.7 acres, 11.6 miles in total. Replace 7 wood p…
Planned activities include accelerating dynamic line rating industry research and development by deploying a limited quantity of small sensors on e…
Design, permit, and drill one stratigraphic well directly East of Tampa, FL. Non-field work is also included for data analysis. …
Demonstrate CO2 capture and utilization of CO2 from coal flue gas for producing algal biomass products for animal feed, with Tasks including charac…
Replace the XLPE cable in affected project area with a 2 inches HDPE duct, which will house the new ethylene propylene rubber (EPR) insulated jacke…
1. New Transformer installed in existing substation 2. New Vacuum Breaker Installed 3. Concrete containment around new transformer 3 Install new bu…
MPEI plans to underground 1.8 miles of existing lines to reduce wildfire risk, and upgrade 3.2 miles of single-phase overhead lines to taller poles…
MPEI proposes using drones to inspect 21,600 poles in their distribution system to identify weak points or damaged or failing components. …