Building 22 Electrical Upgrades CX(s) Applied: B2.5, B4.6 Date: 08/20/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Building 29-31 Internal Electrical Upgrades CX(s) Applied: B2.1, B2.5, B4.6 Date: 08/20/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Pecan Street Smart Grid Extension Service - Phase I CX(s) Applied: A9, A11, B5.1 Date: 08/17/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Plug-in Hybrid Electric Medium Duty Commercial Fleet Demonstration and Evaluation CX(s) Applied: B5.1 Date: 08/17/2012 Location(s): North Carolina Offices(s): National Energy Technology Laboratory
Plug-in Hybrid Electric Medium Duty Commercial Fleet Demonstration and Evaluation CX(s) Applied: B5.1 Date: 08/17/2012 Location(s): Maryland Offices(s): National Energy Technology Laboratory
Online, In-Situ Monitoring Combustion Turbines Using Wireless Passive Ceramic Sensors CX(s) Applied: B3.6 Date: 08/17/2012 Location(s): Florida Offices(s): National Energy Technology Laboratory
B-33 Facility & Heating, Ventilation, and Air Conditioning Renovations CX(s) Applied: B1.3, B1.15 Date: 08/17/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Site-Wide Sidewalk Improvements and Seal and Repair Pavement CX(s) Applied: B1.3 Date: 08/17/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Plug-in Hybrid Electric Medium Duty Commercial Fleet Demonstration and Evaluation CX(s) Applied: B5.1 Date: 08/17/2012 Location(s): California Offices(s): National Energy Technology Laboratory
Commercial Scale Carbon Dioxide Injection and Optimization of Storage Capacity in the Southeastern United States CX(s) Applied: B5.1 Date: 08/17/2012 Location(s): Alabama Offices(s): National Energy Technology Laboratory