Housatonic River Net-Zero-Energy Building at Berkshire Museum CX(s) Applied: B5.1 Date: 08/29/2012 Location(s): Massachusetts Offices(s): National Energy Technology Laboratory
Optimizing Accuracy of Determinations of Carbon Dioxide Storage Capacity and Permanence CX(s) Applied: A1, A9, B3.6 Date: 08/29/2012 Location(s): Wyoming Offices(s): National Energy Technology Laboratory
Asphalt Sealing of Parking Areas and Roadways at National Energy Technology Laboratory, Pittsburgh CX(s) Applied: B1.3 Date: 08/29/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Application of Crunch-Flow to Constrain Present and Past Carbon Fluxes at Gas-Hydrate Bearing Sites CX(s) Applied: A9 Date: 08/29/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
A New Approach to Understanding the Occurrence and Volume of Natural Gas Hydrate in the Northern Gulf of Mexico CX(s) Applied: A9 Date: 08/28/2012 Location(s): Ohio, Connecticut Offices(s): National Energy Technology Laboratory
Building 33 Conference Room Upgrades CX(s) Applied: B1.7 Date: 08/28/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Remove/Demolish T-20, T-14, T-15, T-29 CX(s) Applied: B1.23 Date: 08/25/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Advanced Low Energy Enzyme Catalyzed Solvent for Carbon Dioxide Capture CX(s) Applied: B3.6 Date: 08/24/2012 Location(s): Alabama Offices(s): National Energy Technology Laboratory
Texas Alternative Fuel Vehicle Pilot Program CX(s) Applied: A1 Date: 08/24/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Ohio Advanced Transportation Partnership - EVSE Installation in Walgreens Parking Lot CX(s) Applied: B5.23 Date: 08/24/2012 Location(s): Ohio Offices(s): National Energy Technology Laboratory