Albany PBX Upgrade CX(s) Applied: B1.7 Date: 08/30/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Area of Interest 2: Wellbore Seal Repair Using Nanocomposite Materials CX(s) Applied: A9, B3.6 Date: 08/30/2012 Location(s): New Mexico Offices(s): National Energy Technology Laboratory
Area of Interest 2: Wellbore Seal Repair Using Nanocomposite Materials CX(s) Applied: A9, B3.6 Date: 08/30/2012 Location(s): New Mexico Offices(s): National Energy Technology Laboratory
B17 Roof Replacement & Painting CX(s) Applied: B1.23, B2.1, B2.5 Date: 08/30/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Study and Pilot Test of Preformed Particle Gel Conformance Control Combined with Surfactant Treatment CX(s) Applied: A9, A11, B3.6 Date: 08/30/2012 Location(s): Missouri Offices(s): National Energy Technology Laboratory
Study and Pilot Test of Preformed Particle Gel Conformance Control Combined with Surfactant Treatment CX(s) Applied: A11, B3.6 Date: 08/30/2012 Location(s): Kansas Offices(s): National Energy Technology Laboratory
Enhancement of SOFC Cathode Electrochemical Performance Using Multi-Phase Interfaces CX(s) Applied: B3.6 Date: 08/30/2012 Location(s): Washington Offices(s): National Energy Technology Laboratory
Enhancement of SOFC Cathode Electrochemical Performance Using Multi-Phase Interfaces CX(s) Applied: B3.6 Date: 08/30/2012 Location(s): Massachusetts Offices(s): National Energy Technology Laboratory
Enhancement of SOFC Cathode Electrochemical Performance Using Multi-Phase Interfaces CX(s) Applied: A9 Date: 08/30/2012 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory
Roof Replacement and Fall Arrest System Installation CX(s) Applied: B1.15, B2.5 Date: 08/30/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory