Construction of an Autogas Refueling Network CX(s) Applied: B5.22 Date: 02/07/2014 Location(s): California Offices(s): National Energy Technology Laboratory
I-75 Green Corridor Project CX(s) Applied: B5.22 Date: 02/07/2014 Location(s): Tennessee Offices(s): National Energy Technology Laboratory
Ultra Efficient CHHP using High Temperature Fuel Cell CX(s) Applied: B3.6 Date: 02/06/2014 Location(s): Connecticut Offices(s): National Energy Technology Laboratory
Ultra Efficient CHHP using High Temperature Fuel Cell CX(s) Applied: A9, B3.6 Date: 02/06/2014 Location(s): Connecticut Offices(s): National Energy Technology Laboratory
A Geomechanical Model for Gas Shales Based on Integration of Stress CX(s) Applied: A9 Date: 02/03/2014 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Advanced Analytical Methods for Air and Stray Gas Emissions and Produced Brine Characterization CX(s) Applied: A9, A11, B3.1 Date: 02/03/2014 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Analytical Physics - Transmission Electron Microscopy (TEM) CX(s) Applied: B3.6 Date: 01/30/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Analytical Physics - Thermal Analysis CX(s) Applied: B3.6 Date: 01/30/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Subtask 2.19 - Operational Flexibility of Carbon Dioxide Transport and Storage CX(s) Applied: A9 Date: 01/29/2014 Location(s): North Dakota Offices(s): National Energy Technology Laboratory
I-75 Green Corridor Project CX(s) Applied: A1, A9, B5.22 Date: 01/29/2014 Location(s): Tennessee, Georgia, Florida Offices(s): National Energy Technology Laboratory