Remove the existing B6 HPCF air preheater and replace with an in-kind preheater at the same location. The location is the North side of B6 approxi…
Design, fabrication, and testing of a novel heat engine.…
Utilized for laboratory and bench scale analyses involving the preparation and characterization of granular materials and the operation of small-sc…
Carry out experimental research to convert natural gas to aromatics and hydrogen using catalytic reactor system both at a laboratory scale and a pi…
Administrative and project management activities
Test HHS process using: bituminous coal at Warrior Met in Brookwood, AL
Demolish and replace the existing fence by Building 25.…
Preparing, patching, and repainting all exterior surfaces of the six-story tower.…