Feasibility study that determines the economic and technical feasibility for using IHESS. Computer based modeling, report writing, technology gap a…
The objective is to perform a comprehensive FEED study for the optimized plant configuration at the host site.…
Remodel the B17 Central High Bay area to provide updated offices with new furniture, doors, fire suppression system, new infrastructure, new HVAC, …
Conceptual energy system design, combustion system rig testing, technoeconomic study, technology gap assessment, and commercialization plan.…
Comprehensive computational modeling of reversible methane electrochemical reactor (Recipient). Develop and test reversible methane electrochemical…
The Recipient will scale up kW-class advanced oxygen-free electrolyzer technology to 10-kW level and test it under simulated syngas conditions deri…
Design, build, operate mineral oil flow loop. Develop final field test plan, obtain required paper work/certs by subcontractor, cert data Acq syste…
Implement a collaborative Regional Initiative to accelerate the deployment of carbon capture, utilization, and storage in the Midwestern-Northeaste…
Supporting Electric Vehicle Infrastructure Deployment along Rural Corridors in the Intermountain West…