Identify optimal conditions of biomass/torrefied biomass and coal refuse cofiring to produce carbon-neutral or carbon-negative power generation fro…
Project management, simulations work, experimental research to use biomass for clean hydrogen production using a process intensified membrane gasif…
Develop a field-retrofittable burner capable of operating on 100 percent hydrogen fuel for implementation on the FT4000 industrial gas turbine engi…
Research, development, and demonstration (modeling and simulation, using real-world data) in existing computer lab. Dissemination of results and wo…
Administrative and project management activities, computer modeling and analysis
This is to add a subcontractor to an existing project to test their strain sensor.…
This project consists of computer modeling and simulation of a 4G LTE tower to determine the conducted and radiated threats that may insult equipme…
This is a small laboratory research project to develop novel sorbent materials for direct air capture. The performance of the materials is tested i…
Under Task 2-Technical Challenges, collection of surface reflection seismic. Seismic acquisition will occur in Shelby Cty, AL (nearest town is West…
Administrative and project management activities, computer modeling and analysis