The objective of Phase III is construction and operation phase of the MTR membrane capture system.…
Fundamental lab-scale experiments will be performed at U. of Central Florida and Purdue. …
Admin, office and project mgmt activities; computer modeling, simulation analysis, data analysis, engineering and design of field instrumentation; …
Computational simulation of injector designs and testing of designs based on design rules established with simulations.…
Design and installation of pilot EDR system to treat grey water for reuse at Nebraska Public Power District's coal-fired Gerald Gentleman Station.…
The objective is to apply three different methods for estimating stress in the FORGE EGS geothermal reservoir.…
Work will consist of conducting a pilot test involving the installation of interval control valves (ICVs) into existing horizontal injection well.…
Develop an integrated approach to enhance heat recovery by characterizing and monitoring the impact of fluid and temperature on fracture slip mecha…
Office-based, planning and logistical activities to be performed in support of NETL elements of a hydrate production test on the AK North Slope.…
Conduct lab-scale combustion experiments and complimentary kinetics modeling work to comprehensively study the behavior of high hydrogen content fu…