Collection of refuse pile leachate,surface runoff,and downstream effluent from the acid mine drainage facility sites. Anticipated 4 sets of samples…
HALO pilot-scale fabrication, testing and validation. HALO modeling, management, and lab-scale and prototype testing and validation.…
To develop a novel single-stage dual-layer RPSA (Rapid Pressure Swing Adsorption) process for high purity oxygen production.…
Design, fabricate, assemble and test a fuel reformer on a natural test engine.…
The project’s overall scope is to assess the basin's resources (including sample collection and analysis), potential options for processing those r…
The objective of this project is to determine the hydrogen sealing capacity of storage caverns in bedded salt within the Salado Formation at the DO…
This work will develop and demonstrate a comprehensive, multi-scale, facility-level, methane emissions measurement and reconciliation protocol with…
Collection of both upstream (feed) and downstream (effluent)from the acid mine drainage treatment facility on site. It is anticipated that 8 liters…
Installation of the developed retrofit kit unit including an air management system, sensors, solar power unit and control box. …
Engineering design and analysis, program management, HAZOP review, EH and S risk assessments, TEA, LCA…