This NEPA CX will cover all activities performed under TA3-Phase 2 (implementation), which may include direct education, train-the-trainer,broader …
Project team will fabricate and optimize a sorbent for oxygen production via air seperation. The sorbent and process will be tested within a bench …
Fundamental research on cybersecurity of electric power systems. R and D in Phase I (two years) and Demonstration in Phase II (1 year).…
Collection of refuse pile leachate,surface runoff,and downstream effluent from the acid mine drainage facility sites. Anticipated 4 sets of samples…
HALO pilot-scale fabrication, testing and validation. HALO modeling, management, and lab-scale and prototype testing and validation.…
To develop a novel single-stage dual-layer RPSA (Rapid Pressure Swing Adsorption) process for high purity oxygen production.…
Design, fabricate, assemble and test a fuel reformer on a natural test engine.…
The project’s overall scope is to assess the basin's resources (including sample collection and analysis), potential options for processing those r…