Hot Springs Substation Gravity Drain Install CX(s) Applied: B4.6 Date: 07/19/2012 Location(s): Montana Offices(s): Bonneville Power Administration
Subtask 4.24 – Field Evaluation of a Novel Approach for Obtaining Metal Emission Data CX(s) Applied: B3.1 Date: 06/25/2012 Location(s): Montana Offices(s): National Energy Technology Laboratory
The Shift for Good Community Program (Switch 4 Good) CX(s) Applied: A1, A8, A9, A11 Date: 06/21/2012 Location(s): Multiple Offices(s): National Energy Technology Laboratory
Low Cost Flexible Production System for Remote Ultra Deepwater Gulf of Mexico Field Development CX(s) Applied: A9 Date: 06/19/2012 Location(s): France Offices(s): National Energy Technology Laboratory
Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration
Whitefish In-line Hydroelectric Project CX(s) Applied: B4.1 Date: 05/01/2012 Location(s): Montana Offices(s): Bonneville Power Administration
Recovery Act: A Demonstration System for Capturing Geothermal Energy from Mine Waters Beneath Butte Montana CX(s) Applied: A9, B2.1, B5.19 Date: 04/18/2012 Location(s): Montana Offices(s): Golden Field Office
Renewable Energy Ground Mounted Photovoltaic Grid System Overflow CX(s) Applied: B5.16 Date: 03/29/2012 Location(s): Other Location Offices(s): Golden Field Office
Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards for Commercial Refrigeration Equipment CX(s) Applied: B5.1 Date: 02/06/2012 Location(s): Nationwide Offices(s): Energy Efficiency and Renewable Energy
Integration of Stoltze Land and Lumber Biomass Generation CX(s) Applied: B1.7 Date: 02/02/2012 Location(s): Montana Offices(s): Bonneville Power Administration