BPA proposes to perform routine maintenance activities on the access road serving Swan Valley – Teton Transmission Line near structures 21/1, 22/5,…
Kansas City National Security Campus and New Mexico Operations Routine Operating and Administrative Activities…
Award Number: DE-EE0009384, CX(s) Applied: A9, A11, B3.6, Solar Energy Technologies Office, Location(s): MT, Office(s): Golden Field Office
The Recipient will evaluate the feasibility of capturing surplus electrical energy from renewable sources and off-peak energy at a fossil fuel powe…
Development of sorbent-based carbon capture technology for laboratory and bench scale testing on simulated and actual flue gas at InnoSepra and TCM…
To perform a conceptual study, including capacity optimization, of a hydrogen storage system integrated into an 840 MW combined cycle power plant a…
Feasibility study on crushed-rock thermal energy storage with fossil plant to provide a viable and effective facility in a market with growing pene…
Perform a front-end design and engineering (FEED) study on an oxygen-blown gasification system using a coal/biomass mix to yield high-purity hydrog…
Computational simulations and lab-scale sub-system experiments to obtain performance data and validate results to optimize the design of a pilot-sc…
Subcontractor shall provide all material, labor, supervision, tools, transportation, lodging, and test equipment for obtaining pressurized and unpr…