CX(s) Applied: A9, A11, Advanced Manufacturing Office, Location(s): Multiple, Office(s): Golden Field Office
CX(s) Applied: Multiple, State Energy Program, Location(s): CO, Office(s): Golden Field Office
Accelerating AFV Adoption in Mid-America…
Design and manufacturing of steel wire wrapped pressure vessel utilizing a steel liner for storing hydrogen at high pressure.…
Mid-Atlantic Electrification Partnership…
Feasibility study for the integration of a MPHES system with a full-sized fossil-fired electricity generating unit including a conceptual study, te…
Computer modeling, data analysis, feasibility assessment, laboratory-scale electrochemistry research, sharing of power plant operational data, and …
Dynamic Skip Fire on a Heavy Duty Natural Gas Engine…
Award Number: DE-EE0009372, CX(s) Applied: A9, Solar Energy Technologies Office, Location(s): MT, Office(s): Golden Field Office
BPA proposes to perform routine maintenance activities on the access road serving Swan Valley – Teton Transmission Line near structures 21/1, 22/5,…