Western Area Power Administration (WAPA) proposes a 5-year, Colorado River Storage Project (CRSP) Joint Transmission Dispatch Service (JTDS) formul…
This Second Amended Determination follows changes to the project team and milestones and the approval of additional funds to support the project te…
Funding will support the project team's information gathering and analysis efforts to develop a framework and testbed for evaluating the potential …
Objective is to integrate the liquid salt combined-cycle (LSCC) design in a combined cycle environment, interfaced with existing natural-gas combin…
Evaluate the feasibility of integrating a 1,000 MWh Malta Pumped Heat Energy Storage system, a long-duration, molten-salt-energy storage technology…
Accelerating AFV Adoption in Mid-America…
CX(s) Applied: A5, A6, Building Technologies Office, Location(s): Nationwide, Office(s): Golden Field Office
BPA proposes to fund the Columbia River Inter-Tribal Fish Commission (CRITFC) to monitor and sample Columbia River Zone 6 tribal fisheries (platfor…
The overall project goal is to perform a Phase I study (i.e., conceptual design study) for integration of a 10 MWh Compressed Natural Gas Energy St…
The objective of this project is for the Clean Cities Coalition to provide technical assistance and outreach, participate in program meetings, and …