The Energy Policy and Conservation Act, as amended requires the U.S. Department of Energy (“DOE”) to periodically determine whether more-stringent,…
In this final rule DOE revises the current definition of “showerhead” adopted in a December 16, 2020 final rule by reinstating the prior definition…
In this final rule, DOE proposes to revise the Department’s test procedure interim waiver process.…
The objective of the project is to complete a front-end engineering and design (FEED) study for a commercial-scale, carbon capture system at cement…
Bonneville Power Administration (BPA) proposes to conduct activities listed below to operate and maintain high voltage electrical facilities throughout the BPA service territory.
This Amended Determination follows the approval of additional funds to support the project team's small-scale, research and development activities …
Funding will support the project team's information gathering and analysis efforts to transition the Hydro-FE-a simulation tool uniquely capable of…
The objective of this project is to conduct a Front-End Engineering Design (FEED) study to capture CO2 emissions from flue gas generated at Calpine…
Design, build, and field test PEI-Monolith based CO2 capture unit for NGCC flue gas. Other work includes lab-scale testing, modeling (computer simu…
Make emergency repairs on the Strategic Petroleum Reserve (SPR) system site piping, offsite pipelines, or other designated systems.