The Bonneville Power Administration (BPA) proposes to decommission and remove the Hungry Horse radio station and Teakettle Repeater and install two…
Bonneville Power Administration (BPA) proposes to purchase an easement along approximately the easternmost 2.5 miles of Indreland Road from Missoul…
Western Area Power Administration (WAPA) proposes issuing an Outgrant for Nemont Telephone to install buried fiber line serving the Wolf Point Mont…
This project plans to replace an aging 60kV transmission line with a new 115kV line approximately 7.9 miles in length. In addition to this line, op…
Conduct initial engineering studies to determine and prioritize which grid components to further invest in.…
Conduct initial engineering studies to determine and prioritize which grid components to further invest in.…
Conduct initial engineering studies to determine and prioritize which grid components to further invest in.…
Conduct initial engineering studies to determine and prioritize which grid components to further invest in.…
BPA proposes to install a new battery building and complete associated battery equipment upgrades at the Garrison Substation. The new battery build…
Troy Power and Light plans to replace old electric meters with new smart meters, attaching repeaters to existing power poles to establish a network…