BPA proposes to install a new battery building and complete associated battery equipment upgrades at the Garrison Substation. The new battery build…
Troy Power and Light plans to replace old electric meters with new smart meters, attaching repeaters to existing power poles to establish a network…
BPA proposes to fund the Confederated Salish and Kootenai Tribes (CSKT) to implement Fencing, Vegetation Maintenance, and Structure Removal activit…
Ravalli Electrical Cooperative plans to underground 21.3 miles of existing distribution lines in a designated high wildfire hazard potential area l…
BPA is proposing to replace multiple deteriorating wood pole structures and associated hardware at specific locations in BPA’s Bell and Kalispell d…
BPA proposes to perform in-kind replacement of ten wood pole structures and associated structural/electrical components (e.g. cross arms, insulator…
This Third Amended Determination follows the approval of additional funds, teaming partner, and project milestones to support the project team's sm…
MEC will replace old oil circuit reclosers with new vacuum reclosers throughout the service area. …
Marias River Electric Cooperative (MRE) plans to install new 69kV breakers at the 4-Corners Substation located just west of Oilmont, MT. …
BPA is proposing to fund the Confederated Salish and Kootenai Tribe (CSKT) to purchase the Jocko Springs property, a 14-acre parcel of land located…