Replace copper conductors with aluminum conductors. Add monitoring equipment, control technologies, and replace oil filled reclosures with vacuum r…
Replace oil-filled reclosers with dual-voltage vacuum reclosers to allow for future voltage conversions. The reclosers as well as new oil-filled re…
The project scope includes vegetation management across approximately 200 miles of overhead distribution lines located within HSUD's service territ…
The project scope includes deployment of Supervisory Control and Data Acquisition (SCADA) and an Outage Management System (OMS) to modernize West …
Adding a power transformer to an existing distribution substation, replacing existing reclosers with breakers, and replacing existing relays and co…
Installation of electric recloser hardware kits on 27 existing overhead electric power line poles.…
OCED is proposing to provide funding to RTI International in support of the Carbon Capture Pilot at Vicksburg Containerboard Mill project. During t…
OCED is proposing to provide funding to RTI International in support of the Carbon Capture Pilot at Vicksburg Containerboard Mill project.…
DOE's Office of Clean Energy Demonstrations (OCED) is proposing to provide funding to Path Company in support of their project to install a 1‐megaw…
The U.S. Department of Energy (DOE) is proposing to provide funding to Mississippi State University (MSU) to design, fabricate, and test a solar-po…