Clean and Inspect West Hackberry T-15 Brine Tank CX(s) Applied: B1.3 Date: 08/19/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Thermally Efficient and Protective Cooling Technologies for Advanced Gas Turbines CX(s) Applied: B3.6 Date: 07/23/2013 Location(s): Louisiana Offices(s): National Energy Technology Laboratory
Strategic Petroleum Reserve Computer Services, 2015-2020 CX(s) Applied: B1.7 Date: 07/11/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace Bayou Choctaw 500 KVA Power Transformer CX(s) Applied: B1.3 Date: 07/09/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace West Hackberry Brine Disposal System Header from MOV-51’s to WHT-14/15 Brine Tanks with HDPE Pipe CX(s) Applied: B5.2 Date: 07/03/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace Obsolete West Hackberry Raw Water Injection Pump Vibration Transmitters CX(s) Applied: B5.2 Date: 06/24/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
An Integrated Study on a Novel High Temperature High Entropy Alloy CX(s) Applied: B3.6 Date: 06/03/2013 Location(s): Louisiana Offices(s): National Energy Technology Laboratory
An Integrated Study on a Novel High Temperature High Entropy Alloy CX(s) Applied: B3.6 Date: 06/03/2013 Location(s): Louisiana Offices(s): National Energy Technology Laboratory
Hydrogen Peroxide Treatment of Strategic Petroleum Reserve Heat Exchangers BOA CX(s) Applied: B1.3 Date: 04/23/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace Brine Disposal System Header to West Hackberry Brine Tanks, Government Furnished Equipment CX(s) Applied: B1.3 Date: 04/22/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office