Bonneville Power Administration (BPA) proposes to fund Idaho Fish and Game to construct and replace four fish screens on private lands in the Upper…
This proposed project will modify the plant protective system (PPS) in Advanced Test Reactor (ATR) to allow operation of lobe powers from 60 MW up …
The project has decided that the use of pole-mounted fiber is better suited for the area.…
Site potable water will be plumbed from the underground main or MFC-788 and run underground to a connection in TR-52. Sewer from TR-52 will be run …
Project scope includes experiment design, analyses, hardware fabrication, fuel specimen fabrication, irradiation, and post-irradiation examination …
BPA proposes to fund the Idaho Department of Fish and Game to decommission and obliterate two existing irrigation ditches that divert water from th…
Research and Development activities at the WRTTF East Test Pad are expected to increase in the future and infrastructure improvements to the facili…
This project is a continuation of prior work to develop a fogged or sprayed fixative for entraining airborne particulates and affixing them to surf…
The INL Fire Department (FD) has been given permission to use building TAN-610 for training purposes.…
The proposed project will lead to the understanding of the ground-state properties of this material that can be extended to other correlated actini…