The scope of work will include removing one existing spruce tree and stump located to the southeast of TRA-649 due to "line of sight" security conc…
This revision includes additional nearby locations for the placement of the existing two test generators (testing exemption – no APAD required) to …
For the Fiscal Year (FY)-24, INL’s LDRD program focuses on the laboratory’s five strategic initiatives: INL’s three emerging core capabilities, one…
As part of the ATR electrical system upgrades, the 670 -M-42 and M-43 Diesel Generators (50 yrs old) are to be replaced and relocated to the area…
BPA proposes to fund the Shoshone-Paiute Tribe to install two 24-inch diameter culverts at existing unimproved vehicle fords in Warm Springs Creek …
This revision includes the updated facility number, floorplan, and additional projects that will be transferred to the Lindsay Blvd Complex (IF-695…
An N and HS Sponsor requires a remote communications facility for testing and training at Cell Site 6 - INL/CITRC/ARA (43032'00"N 112049'50"W). The…
The scope of this effort includes installation of a new generator, the associated support systems required for operation (cooling, lube oil, fuel, …
BPA would be selling the East Hills Substation to South Side Electric. The new change of ownership at East Hills Substation would be the point at …
Bonneville Power Administration (BPA) proposes to install a new communications tower at the summit of Grouse Peak in Custer County, Idaho. BPA is c…