Idaho National Laboratory (INL) has been identified by Liteye as the ideal location to provide counter Unmanned Aircraft Systems (cUAS) systems tes…
Bonneville Power Administration (BPA) proposes to fund the Nez Perce Tribe to conduct floodplain restoration repairs and revegetation efforts on a …
Bonneville Power Administration (BPA) proposes to create a loop from BPA’s Heyburn-Adelaide No.1 transmission line between existing structures 6/2 …
BPA proposes to fund the Coeur d’Alene Tribe to replace an undersized culvert on Parrot Creek, an intermittent tributary of Hangman Creek approxima…
The proposed parking lot changes would provide more employee parking stalls, create a heavy equipment staging area, a contractor vehicle queue for …
N and HS personnel will be conducting 500KW generator testing over the course of the next two to three years with approximately 250 hours of operat…
The U.S. Geological Survey (USGS) needs geologic, stratigraphic, and hydraulic data for the purpose of characterizing groundwater flow and water qu…
Bonneville Power Administration (BPA) proposes to fund the routine operation and maintenance of existing fencing, irrigation infrastructure, and in…
Battelle Energy Alliance (BEA) is performing the “INL PVHA Project” to conduct a Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 study on …
This revision addresses work proposed under a Cooperative Research and Development Agreement (CRADA) and Strategic Partnership Project (SPP) with L…