Zero Power Physics Reactor Surveillance Glove Box CX(s) Applied: B2.5 Date: 07/09/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Idaho National Laboratory Administration Building (IAB)Telephone Room 112 Heating, Ventilating, and Air Conditioning (HVAC) Upgrade CX(s) Applied: B1.4 Date: 07/05/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Rexburg Bus Lot Lease Termination CX(s) Applied: B1.24 Date: 07/05/2012 Location(s): Idaho Offices(s): Idaho Operations Office
State Energy Plan Council School District Woody Biomass Project CX(s) Applied: B5.1, B5.5 Date: 07/02/2012 Location(s): Idaho Offices(s): Golden Field Office
Lancaster Line and Load Project CX(s) Applied: B4.6, B4.7 Date: 06/28/2012 Location(s): Idaho Offices(s): Bonneville Power Administration
Materials and Fuel Complex – Sodium Processing Facility Tank System Resource Conservation and Recovery Act Closure CX(s) Applied: B6.1 Date: 06/27/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Reverse Osmosis System Removal CX(s) Applied: B1.26 Date: 06/25/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Naval Reactors Facility Parking Lot Expansion General Plant Project CX(s) Applied: B1.15 Date: 06/20/2012 Location(s): Idaho Offices(s): Naval Nuclear Propulsion Program, Naval Reactors
Categorical Exclusion Determination
Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration