CX-008726: Categorical Exclusion Determination

Idaho National Laboratory Administration Building (IAB)Telephone Room 112 Heating, Ventilating, and Air Conditioning (HVAC) Upgrade CX(s) Applied: B1.4 Date: 07/05/2012 Location(s): Idaho Offices(s): Idaho Operations Office

Office of NEPA Policy and Compliance

July 5, 2012
Estimated Read Time   min
Idaho National Laboratory Administration Building (IAB)Telephone Room 112 Heating, Ventilating, and Air Conditioning (HVAC) Upgrade
CX(s) Applied: B1.4
Date: 07/05/2012
Location(s): Idaho
Offices(s): Idaho Operations Office

The proposed project will install a new air conditioning unit in the Idaho National Laboratory Administration Building room 112. The new air conditioning system will handle the equipment heat loads within this room.