This revision adds scope to revision 1 of the environmental checklist (EC). Power Management has identified additional power poles that need to be …
The purpose of this overarching EC is to address activities through FY 2020 that would meet the intent of the Categorical Exclusion (CX) B1.3 as de…
The Air Drop Mission Planner System is an aircraft tool in the aircraft that calculates an acceptable cargo release point when given a desired land…
The purpose of the proposed action is to construct and operate a new 11,360 ft2, single-story Security Support Building at the Advanced Test Reacto…
Idaho National Laboratory (INL) lacks enough office space at the Research and Education Campus (REC) in Idaho Falls to accommodate a growing work f…
There are five projects proposed as Supplemental Environmental Projects to settle the penalty for failing to initiate treatment of sodium bearing w…
The purpose of this revision is to cover ground preparation activities for Pad A that were overlooked in the original EC. The ground will need to b…
The South Texas Project (STP) Nuclear Operating Company, in collaboration with Illinois Fire Service Institute (IFSI), proposes to develop and impl…
Purchase, install, and operate a new aboveground diesel fuel storage tank for the emergency backup air compressor located at the Idaho Nuclear Tech…
The 180 kW emergency diesel generator for the Fuels and Applied Science Building (FASB) at the Materials and Fuels Complex (MFC) building MFC-787 n…