This revision adds new poles at CITRC on circuit 54. Poles will be: 54-26A-1, 54-9-4-3 and 54-9-4-4.…
The purpose of this revision is to add the replacement of the TAN-679 roof. The environmental aspects and conditions and instructions remain the sa…
The proposed National Science Foundation (NSF)-funded study between Boston University and Washington State University examines coherent atmospheric…
The proposed action relocates Idaho National Laboratory (INL) Personal Property Excess Services from the Central Facilities Area (CFA) to the Idaho…
This revision adds scope to revision 1 of the environmental checklist (EC). Power Management has identified additional power poles that need to be …
The purpose of this overarching EC is to address activities through FY 2020 that would meet the intent of the Categorical Exclusion (CX) B1.3 as de…
The Air Drop Mission Planner System is an aircraft tool in the aircraft that calculates an acceptable cargo release point when given a desired land…
The purpose of the proposed action is to construct and operate a new 11,360 ft2, single-story Security Support Building at the Advanced Test Reacto…
Idaho National Laboratory (INL) lacks enough office space at the Research and Education Campus (REC) in Idaho Falls to accommodate a growing work f…
There are five projects proposed as Supplemental Environmental Projects to settle the penalty for failing to initiate treatment of sodium bearing w…