The proposed action involves aerial application of bulk sagebrush seed to areas burned by the Sheep Fire in July 2019 by Thomas Helicopter, a com…
This EC revision includes a handful of scope additions. …
The latest capability upgrade requirement is to add LTE Band 4 and Band 5 capability to the existing Wireless Test Bed (WTB) LTE Network. To implem…
The proposed work activity is to remove a recent modification from the Advanced Test Reactor (ATR) Control room air conditioner, 670-HVA-2. The mod…
The purpose of this Environmental Checklist (EC) is to address the redesign and installation of the new Advanced Test Reactor (ATR) Low Pressure Ai…
The proposed action aims to develop a next-generation high-temperature compact heat exchanger (HX) using additive manufacturing (AM) techniques wit…
Idaho National Laboratory (INL) is revising this environmental checklist (EC) from a second tier EC to a first tier EC and to clarify project scope.…
In 2016, Power Management identified the need to store heavy equipment indoors during adverse weather conditions. …
This revision addresses two changes: 1) The categorical exclusion covering this activity was changed from B2.5 "Facility Safety and Environmental I…
The proposed activity of this EC comprises two connected actions: • Replace several aging components of the ATR primary coolant system (PCS), and •…