Categorical Exclusion Determinations: Idaho Operations Office

INL Power Group will be installing a transformer to drop power from 138 kV to 13.8 kV from INL substation. Aalo will then install 14 power poles and a 480V transformer to distribute power throughout the Aalo site.
New RSWF capability/unit to design and install a storage pad for NRIC microreactors post-irradiation. Construction of a storage pad and necessary u…
This document outlines the job requirements for the Environmental Review Process (ERP) concerning (4) Launch Pad temporary sign sites, the skids on…
The Idaho National Laboratory (INL) will collaborate with Lawrence Livermore National Laboratory (LLNL) to support the design and execution of an e…