Award Number: DE-AC36-08GO28308, CX(s) Applied: A9, B3.2, NREL, Location(s): CO, Office(s): Golden Field Office
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace existing Structures 15/1, 15/5, 15/6, and 16/4, on its Lo…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace and remove aging equipment at its Ault (AU) Substation i…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), conducted emergency structure replacement of Structures 35/4, 35/5, 35/6 and …
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace the deficient roof on the control building at its Ault (A…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace existing Structure 40/5 on its Gore Pass-Hayden (GOT-HDN)…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace existing structure 15/7, on its Boyd-Airport (BYD-ARP) 11…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace existing Structures 17/1-17/5 and 17/7-17/9, on its Rosed…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace Structure 0/4, a wood single pole, on its Weld-Whitney (W…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace existing Structures 1/4 and 5/6 on its Flatiron-Valley (F…