Kremmling-Windy Gap 138-kilovolt Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 11/21/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Hayden Communications Site Tower Removal and Parking Area Grading (Amended) CX(s) Applied: B1.3, B1.19 Date: 11/21/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Gore Pass-Kremmling 138-kilovolt Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 11/21/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Advancement of the Kinetic Hydropower System to Department of Energy Technology Readiness Level 7/8 CX(s) Applied: B3.6 Date: 11/20/2013 Location(s): New York, Connecticut, New York, Colorado Offices(s): Golden Field Office
Akron Hill Communication Site Cable Project CX(s) Applied: B1.3 Date: 11/19/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
The Impacts of Pore-Scale Physical and Chemical Heterogeneities on the Transport of Radionuclide-Carrying Colloids CX(s) Applied: B3.6 Date: 11/14/2013 Location(s): Colorado Offices(s): Idaho Operations Office
Sorbent Based Post-Combustion Carbon Dioxide (CO2) Slipstream Testing CX(s) Applied: B3.6 Date: 11/13/2013 Location(s): Colorado Offices(s): National Energy Technology Laboratory
Sorbent Based Post-Combustion Carbon Dioxide (CO2) Slipstream Testing CX(s) Applied: B3.6 Date: 11/13/2013 Location(s): Colorado Offices(s): National Energy Technology Laboratory
Heat Integration with Solid Sorbent Based Carbon Dioxide Capture CX(s) Applied: B3.6 Date: 10/28/2013 Location(s): Colorado Offices(s): National Energy Technology Laboratory
Heat Integration with Solid Sorbent Based Carbon Dioxide Capture CX(s) Applied: A9 Date: 10/25/2013 Location(s): Colorado Offices(s): National Energy Technology Laboratory