Vessel Burst Test Site, Site 300, Lawrence Livermore National Laboratory CX(s) Applied: B3.11 Date: 06/03/2014 Location(s): California Offices(s): Lawrence Livermore Site Office
Crossman Peak Communication Site Lease and Equipment Upgrades at 5 Facilities CX(s) Applied: B1.19 Date: 06/02/2014 Location(s): Arizona, Arizona, Arizona, California, Nevada Offices(s): Western Area Power Administration-Desert Southwest Region
Development of Advanced CFD Tools for Enhanced Prediction of Explosion Pressure Development and … CX(s) Applied: A9, A11, B3.6, B3.11 Date: 05/27/2014 Location(s): California Offices(s): National Energy Technology Laboratory
Defense Logistics Agency, Tracy, California, Wind Resource Assessment CX(s) Applied: A9, B3.1 Date: 05/07/2014 Location(s): California Offices(s): Golden Field Office
Thermochemical Storage with Anhydrous Ammonia: Optimizing the Synthesis Reactor for Direct Production of Supercritical Steam CX(s) Applied: A9 Date: 05/06/2014 Location(s): California Offices(s): Golden Field Office
Solar Energy Parking Canopy Demonstration Project CX(s) Applied: A9, B1.15, B5.16 Date: 05/05/2014 Location(s): California Offices(s): Golden Field Office
Recovery Act: Slipstream Testing of a Membrane Carbon Dioxide Capture Process for Existing Coal-Fired Power Plants CX(s) Applied: A1, A9, B3.6 Date: 04/28/2014 Location(s): California Offices(s): National Energy Technology Laboratory
Wood Pole Testing for 20 Transmission Lines in Southern Arizona and Southern California CX(s) Applied: B3.1 Date: 04/17/2014 Location(s): Arizona, Arizona, Arizona, California, California Offices(s): Western Area Power Administration-Desert Southwest ...
Lease Extension for the Existing Leased Space for the Office of the Chief Financial Officer CX(s) Applied: B1.15, B1.24 Date: 04/15/2014 Location(s): California Offices(s): Berkeley Site Office
Oxy-Fired Pressurized Fluidized Bed Combustion - Phase II CX(s) Applied: B3.6 Date: 04/04/2014 Location(s): California Offices(s): National Energy Technology Laboratory