This environmental questionnaire includes the replacement of analog utility service meters with advanced meter infrastructure.…
This project is research, development, and demonstration (RD and D), R and D in Phase 1 (2 years) and Demonstration in Phase 2 (1 year). …
This Amended Determination follows the approval of additional funding and project milestones to support the project team's small-scale research and…
WAPA proposes to repair erosion damage at selected existing access roads in western Fresno County between Towers 45-4 and 46-4 and an isolated repa…
The access roads and structures associated with the Los 8anos-Gate No. 3 also known as Path 15 transmission line are highly susceptible to erosion …
This Amended Determination follows the approval of additional funds and new project location at Lawrence Berkeley National Laboratory (LBNL) to con…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Noria Energy Holdings LLC (Noria) to design, develop, and test a flo…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to FirstElement Fuel (FEF) to design, develop, fabricate, and implement…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to ZymoChem, Inc. (ZymoChem) for research and development activities re…
WAPA proposes to replace 17 miles of existing overhead static line with OPGW (optical ground wire) on three 230 kilovolt transmission lines (Keswic…