Bonneville Power Administration (BPA) proposes to provide funding to the Yakama Nation to implement improvements to an overhead cover for rearing t…
Bonneville Power Administration (BPA) proposes to remove structure 3/10 and to replace structures 3/9 and 4/1 on the 115-kilovolt (kV) Ellensburg-M…
To maintain reliable power in the region, Bonneville Power Administration (BPA) proposes to perform in-kind replacement of five wood pole structure…
The Bonneville Power Administration (BPA) plans to perform road maintenance to improve and construct access roads and install new landings for the …
Bonneville Power Administration (BPA) proposes to install jumpers between the Benton Rural Electric Association (BREA) substation tap line and stru…
Bonneville Power Administration (BPA) proposes to fund the Idaho Department of Fish and Game (IDFG) to survey species populations and remove rainbo…
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…
Bonneville Power Administration (BPA) proposes to upgrade substation and telecommunications equipment at Salmon River Electric Cooperative, Inc.’s …
Bonneville Power Administration (BPA) proposes to replace and/or reroute portions of the roof drainage piping system at BPA’s Celilo Maintenance He…
Bonneville Power Administration (BPA) proposes to fund the National Marine Fisheries Service (NMFS) to assess the migrational characteristics and e…