BPA proposes to fund the Shoshone-Bannock Tribes (SBT) to monitor the Chinook salmon population in Bear Valley. The project goal is to collect data…
BPA proposes to rebuild and reconfigure a disconnect switch system along the Grandview-Red Mountain No. 1 Transmission Line at Prosser Tap. The Pro…
Bonneville Power Administration (BPA) proposes to provide funds to the Nez Perce Tribe of Idaho (NPT) to perform routine maintenance actions for th…
Bonneville Power Administration (BPA) proposes to allow Avista Corporation, the applicant, to rebuild a portion of their single-circuit Hatwai-Mosc…
Bonneville Power Administration (BPA) proposes to rebuild the first 4 miles of its Red Mountain-White Bluffs 115-kV transmission line from Red Moun…
Bonneville Power Administration (BPA) proposes to rebuild three spans of the double-circuit Bell-Boundary No. 3 ꟷ Addy-Colville No. 1 transmission …
Bonneville Power Administration (BPA) proposes to upgrade, replace, and install new electrical station service and fiber optic cable networks acros…
Bonneville Power Administration (Bonneville) proposes to repurpose financial reserves to certain power uses under the Power Reserves Distribution C…
Bonneville Power Administration (BPA) proposes to remove and add equipment at the Red Mountain Substation to interconnect new Benton Public Utility…
Bonneville Power Administration (Bonneville) is proposing to become a binding participant of Western Resource Adequacy Program (WRAP) administered …