Categorical Exclusion Determinations: Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to fund the Kittitas County Conservation District (KCCD), a member of the Yakima Tributary Access and Habitat Program (YTAHP) work group, to implement the Parke Creek 1.0 and 1.4 Fish Passage and Screening Project on private land near Ellensburg, Washington.
Bonneville Power Administration (BPA) proposes to allow the T-Mobile corporation to remove and replace multiple antennas, remote radio units (RRUs) and associated equipment at 10 wireless sites, see table below for site name, associated BPA facility and description of equipment to be replaced.
Bonneville Power Administration (BPA) proposes to fund the North Yakima Conservation District (NYCD) of the Yakima Tributary Access and Habitat Program (YTAHP) work group to implement the Wenas Creek at McKinney riparian enhancement project on private land near Naches, Washington.
Bonneville Power Administration (BPA) proposes to allow T-Mobile to modify its existing unmanned telecommunications facility located adjacent to BPA’s Maple Valley Substation in Renton, King County, Washington (Township 23 North, Range 5 East, Section 20).
Bonneville Power Administration (BPA) proposes to replace an existing 230-kilovolt (kV) shunt capacitor group and associated switching and protective equipment at Longview Substation near Longview, Cowlitz County, Washington (Township 8 North, Range 3 East, Donation Land Claim 38).
Bonneville Power Administration (BPA) proposes to allow the ATT corporation to make upgrades to antennas and associated equipment within their existing communications facility located on structure 74/2 of the Monroe-Custer No. 1 240 kV transmission line.