BPA proposes to fund the Confederated Tribes of Warm Springs Reservation of Oregon (CTWS) to implement 165 acres of Western juniper removal on a 49…
Bonneville Power Administration (BPA) proposes to execute contracts under the Boardman to Hemingway (“B2H”) with Transfer Service plan of service.…
Bonneville Power Administration (BPA) proposes to enlarge a landing and replace a recently damaged wood pole structure on the Bandon-Rogue No. 1 hi…
Bonneville Power Administration (BPA) proposes to replace marker balls on 17 transmission lines in Benton, Chelan, Columbia, Douglas, Franklin, Gar…
Bonneville Power Administration (BPA) is proposing to address a distressed wood pole structure on the Shelton-Fairmount No. 2 transmission line at …
Bonneville Power Administration (BPA) proposes to perform in-kind replacement of two wood pole structures (48/5 and 112/3) and associated structura…
Bonneville Power Administration (BPA) proposes to fund the Columbia River Estuary Study Taskforce (CREST) to implement a channel reconnection proje…
The Bonneville Power Administration (BPA) is proposing to allow Portland General Electric (PGE) to build a portion of their new Horizon-Keeler 230-…
Bonneville Power Administration (BPA) proposes to correct 31 impairments along approximately 22 miles of the 115-kilovolt (kV) Grandview-Red Mounta…
CX-027713: Cascade Orchard Irrigation Company (COIC) Irrigation Efficiency and Pump Exchange Project
BPA proposes to fund the Chelan County Department of Natural Resources (CCDNR) to implement improvements to irrigation infrastructure owned and ope…