Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration
Four AT&T Wireless Communication Site Upgrades CX(s) Applied: B1.7, B1.19 Date: 07/27/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration
Short-term Additional Amendments to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 07/23/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration
Columbia and Willamette River Crossings Liquefaction Hazard Assessment CX(s) Applied: B3.1 Date: 07/23/2012 Location(s): Oregon, Oregon, Washington, Washington Offices(s): Bonneville Power Administration
Hills Creek-Lookout Point No. 1 Wood Pole Replacements CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Schultz-Raver No.1 Right-Of-Way Marking Project CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Olympia-Grand Coulee Structure 85/5 Relocation Project CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Hot Springs Substation Gravity Drain Install CX(s) Applied: B4.6 Date: 07/19/2012 Location(s): Montana Offices(s): Bonneville Power Administration
Ostrander-Troutdale No. 1, Structure 16/1, Access Road Improvement Project CX(s) Applied: B1.3 Date: 07/18/2012 Location(s): Oregon Offices(s): Bonneville Power Administration