Insulator Replacement on Bonneville Power Administration's (BPA) North Bonneville-Midway No. 1 Transmission Line CX(s) Applied: B4.6 Date: 07/16/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
July 16, 2013Insulator Replacement on Bonneville Power Administration's (BPA) North Bonneville-Midway No. 1 Transmission Line
CX(s) Applied: B4.6
Date: 07/16/2013
Location(s): Washington
Offices(s): Bonneville Power Administration
In order to provide continued system reliability, Bonneville Power Administration (BPA) proposes to replace insulators along the North Bonneville-Midway No. 1, 230-kilovolt (kV) transmission line from structures 1/1 to 10/1.