Pilot butte-Lapine Transmission Line Wood Pole Replacement, Redmond District CX(s) Applied: B1.3Date: 08/10/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Cornerstone Project Property Acquisition and Stewardship Funding CX(s) Applied: B1.25Date: 08/10/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Pratt Creek Ranch Conservation Easement Property Acquisition Funding CX(s) Applied: B1.25Date: 08/10/2016 Location(s): IdahoOffices(s): Bonneville Power Administration
NW Natural Pipeline Installation CX(s) Applied: B4.9Date: 08/09/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Airport Road Substation Interconnection on Albany-Lebanon Transmission Line CX(s) Applied: B4.11Date: 08/09/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Drummond-Macks Inn Transmission Line Access Road Construction, Idaho Falls District CX(s) Applied: B1.13Date: 08/05/2016 Location(s): IdahoOffices(s): Bonneville Power Administration
Lapine-Chiloquin Wood Pole Replacement, Redmond District CX(s) Applied: B1.3Date: 08/05/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Fiber Optic Cable Installation at Maupin Substation CX(s) Applied: B4.7Date: 08/01/2016 Location(s): OregonOffices(s): Bonneville Power Administration
South-of-Allston Flow Congestion Relief Pilot Program: Energy Purchase from Avangrid Renewables CX(s) Applied: B4.4Date: 08/01/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Alvey District Pole Replacement Project CX(s) Applied: B1.3Date: 08/01/2016 Location(s): OregonOffices(s): Bonneville Power Administration