Hungry Horse Radio Station Shelter Installation CX(s) Applied: B1.19Date: 08/25/2016 Location(s): MontanaOffices(s): Bonneville Power Administration
Brasada-Harney, Redmond-Brasada No. 1 Transmission Lines 2016 Wood Pole Replacements CX(s) Applied: B1.3Date: 08/23/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Lane Substation Fiber Separation CX(s) Applied: B4.7Date: 08/23/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Kennedy Tap Switch Addition CX(s) Applied: B4.11Date: 08/19/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Troutdale Substation Fiber Installation CX(s) Applied: B4.7Date: 08/17/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Muddy Valley Habitat Reserve Acquisition and Stewardship Funding CX(s) Applied: B1.25Date: 08/17/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Lyle Falls Fishway and Research Facility Maintenance CX(s) Applied: B1.3Date: 08/17/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Big Eddy-Chenoweth No. 2 Impairment Remedies CX(s) Applied: B1.3Date: 08/15/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
North Bonneville-Troutdale No. 1 Transmission Line Gate Replacement CX(s) Applied: B1.3Date: 08/11/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Big Eddy-Redmond Transmission Line Wood Pole Replacements CX(s) Applied: B1.3Date: 08/10/2016 Location(s): OregonOffices(s): Bonneville Power Administration