Bonneville Power Administration (BPA) proposes to acquire approximately 800 easements from the Montana Department of State Lands for its existing t…
BPA proposes to replace non-ceramic insulators (NCIs) with ceramic insulators on sections of the Eugene-Alderwood, Albany-Eugene, Parker Tap, and J…
The Bonneville Power Administration (BPA) is proposing to fund the Confederated Tribes of Warm Springs to implement a stream restoration project on…
BPA is proposing to fund Polk Soil and Water Conservation District (PSWCD) to purchase the Smithfield Oaks property, which is a 179-acre parcel of …
BPA proposes to fund the Nez Perce Tribe’s installation and operation of a new Passive Integrated Transponder (PIT) tag array on the north bank of …
Bonneville Power Administration (BPA) proposes to acquire additional right-of-way (ROW) easement along the Brasada-Harney-No. 1 transmission line t…
A survey of the 500kV Monroe-Custer No. 1 transmission line resulted in the identification of a Snohomish County PUD (SCPUD) distribution line that…
BPA proposes to remove the outdated control house at Maupin Substation to accommodate additional equipment to meet future needs. Equipment used to …
BPA proposes to sell Norway Substation to Coos-Curry Electrical Cooperative. The property is comprised of 1.32 acres of BPA fee-owned land. CoosCur…
BPA proposes to provide funding to the Yakima Klickitat Fisheries Program (YKFP) to implement improvements to a raceway at the Jack Creek Acclimati…