BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, g…
Bonneville Power Administration (BPA) proposes to interconnect two 20-megawatt (MW) solar development projects to BPA’s electrical transmission sys…
The under-construction Fleet Services Building (FSB) – a 36,000 square-foot multi-purpose mobile equipment and transportation center in the JD Ross…
Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and any associated hardware and guys at the above …
Bonneville Power Administration (BPA) is proposing to upgrade equipment at Longview Substation, the Longview Annex, and Allston Substation. The wor…
BPA proposes to acquire a conservation easement to be granted by the Washington Department of Natural Resources (WDNR) on 40 acres in King County, …
BPA is proposing to fund the Confederated Salish and Kootenai Tribes to purchase the Revais Westslope property, a 2.5-acre parcel of land located 6…
Bonneville Power Administration (BPA) is proposing to resurface the bridge crossing of Butte Creek, which leads to BPA’s Raymond Substation. The br…
BPA proposes to replace 16 structures and improve access roads on the Fairview-Bandon No. 1, Reedsport-Fairview No. 1, Tahkenitch-Reedsport No. 1, …
BPA is proposing to perform routine road maintenance to approximately 2.69 linear miles of existing access road for the Grand Coulee – Chief Joseph…