Waste Minimization and Reuse CX(s) Applied: B3.6; B6.8 Date: 11/19/2012 Location(s): Tennessee, California, Virginia Offices(s): Berkeley Site Office
Alterations to Existing Buildings Construction of Small-Scale Support Structures and Relocation of Machinery and Equipment CX(s) Applied: B1.11; B1.15; B1.31 Date: 11/09/2012 Location(s): Tennessee, California, Virginia Offices(s): Berkeley Site Office
Interim Corrective Measures to Control Migration of Contaminated Groundwater CX(s) Applied: B6.9 Date: 09/19/2012 Location(s): California Offices(s): Berkeley Site Office
Lease Space and Operate Kbase at Emery Station CX(s) Applied: B1.24; B2.1; A9 Date: 12/15/2011 Location(s): California Offices(s): Berkeley Site Office
Sanford Underground Research Facility CX(s) Applied: B2.1; B3.6 Date: 12/01/2011 Location(s): South Dakota Offices(s): Berkeley Site Office
Onsite Solar Photovoltaic System CX(s) Applied: B5.1 Date: 10/04/2011 Location(s): California Offices(s): Berkeley Site Office
Replace Existing Firehouse CX(s) Applied: B1.15 Date: 09/20/2011 Location(s): California Offices(s): Berkeley Site Office
Relocate Existing Meteorological Tower at Lawrence Berkeley National Laboratory CX(s) Applied: B3.1 Date: 08/02/2011 Location(s): California Offices(s): Berkeley Site Office
Construction and Operation of the User Test Bed Facility at Lawrence Berkeley National Laboratory CX(s) Applied: B1.4; B1.5; B1.7; B1.15; B1.16; B1.23; B1.31; B2.2; B3.6 Date: 06/16/2011 Location(s): California Offices(s): Berkeley Site Office
Installation of a Prefabricated 130 Square Feet Building Adjacent to Building 67 CX(s) Applied: B6.4 Date: 03/23/2011 Location(s): California Offices(s): Berkeley Site Office