Rev. 2. The sealant that was applied to the culvert adjacent to the paved area and the culvert across the fence at SRMC as described in Revision 1 …
This scope covers remediation activities at the H06 outfall.…
Rev 1. Revision 1 will also cover the sealing of the culvert adjacent to the paved area as well as the culvert across the fence at SRMC which were …
Rev. 6 : No ash is planned to be moved at this time. SCDHEC clarified to SRS that the excavation/movement of ash is not required to demonstrate ope…
The scope of work is to lay a 2” thick (min) layer of 9.5 mil asphalt mix with a non-woven geotextile underlayment applied over a tack coat over th…
Access to Steel Creek to perform routine long-term sampling of surface water and shallow monitoring wells is not easily accessible. Samplers are re…
The primary purpose of the Building Q3 Dismantlement Project is to remove the existing building to accommodate the construction of a new multi-story office building, along the eastside of the Knolls Laboratory, Building Q3.
Revision 0 of this EEC ONLY includes transfer of the effluent to the tanker trailer and sample collection/analysis.…
During routine sampling of HP-50 on 03/19/2022 by Savannah River Tritium Enterprise (SRTE), the pH of the effluent was identified as significantly …
Legacy asbestos waste in D-Area will be repackaged and transported for proper disposal.…