The scope of work is to lay a 2” thick (min) layer of 9.5 mil asphalt mix with a non-woven geotextile underlayment applied over a tack coat over th…
Access to Steel Creek to perform routine long-term sampling of surface water and shallow monitoring wells is not easily accessible. Samplers are re…
The primary purpose of the Building Q3 Dismantlement Project is to remove the existing building to accommodate the construction of a new multi-story office building, along the eastside of the Knolls Laboratory, Building Q3.
Revision 0 of this EEC ONLY includes transfer of the effluent to the tanker trailer and sample collection/analysis.…
During routine sampling of HP-50 on 03/19/2022 by Savannah River Tritium Enterprise (SRTE), the pH of the effluent was identified as significantly …
Legacy asbestos waste in D-Area will be repackaged and transported for proper disposal.…
A new wireless remote Start/Stop will be installed at M-Area Recovery Wells (RWMs) 2, 3, 4, 5, 6, 7, 8, 10, and 18.…
Emulsified zero valent iron (EZVI) will be injected into the subsurface using six fracture/injection points northwest of the M-Area Settling Basin.…
As part of the 288-F Ash Basin Landfill Reclamation Project, this activity will involve an annual relocation of approximately 3,800 cubic yards (2,…
The Western Area Power Administration (vi APA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the …