The Knolls Laboratory (Site) Security Upgrade Major Construction Project (Project) encompasses the installation of various upgrades to Site security buildings and infrastructure that is over 65 years old. The upgrades will improve Site physical security and operational efficiency. Existing security infrastructure and buildings will be remediated and demolished as part of the Project.
DOE-LM is proposing to upgrade the pore water extraction system at the Rifle, Colorado, Disposal Site to prevent the rising water level in the disp…
Vent 19 miniature equipment gas cylinders at 737-A.…
Venting or direct-shipment and disposal of specialty gas cylinders (nitrogen, carbon dioxide, compressed air) in A Area.…
There is one approx. 35 cu ft, non-flammable Nitrogen Compressed Gas (cylinder) that was part of a night vision purge kit. We plan to vent it.…
This project is specific to the implementation of a Record of Decision (ROD) for three FFA subunits that are located within the N Area boundary: Ea…
This activity will excavate, remove, and dispose of underground legacy vessels (presumed septic tank and distribution box) and associated piping/co…
Non-hazardous gases remaining in five Silco cans located at HRTL will be vented to atmosphere
The U. S. Department of Energy (DOE), Richland Operations Office (RL), Infrastructure and Services Division (ISD) proposes to modify the 13.SkV ele…
Vent 1 Argon cylinder at 737-A.…