Tucson Substation Rebuild- Stage 02 Project CX(s) Applied: B4.11Date: 03/31/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Reconstruction of the V.T. Hanlon Substation CX(s) Applied: B4.11Date: 03/23/2015 Location(s): South DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Reconstruction of the V.T. Hanlon Substation CX(s) Applied: B4.11Date: 03/23/2015 Location(s): South DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Reconstruction of V.T. Hanlon Substation CX(s) Applied: B4.11Date: 03/23/2015 Location(s): South DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region
Hardeson Battery Generator Integration CX(s) Applied: B4.11Date: 02/25/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Weld-Kersey West Tap Transmission Line Interconnect Project Weld County, CO CX(s) Applied: B4.11Date: 02/03/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region
Farm Energy Trust Facilities Use Agreement CX(s) Applied: B4.11Date: 01/14/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Sheridan Hill 115-kilovolt Tap Project Yuma County, Colorado CX(s) Applied: B4.11Date: 01/13/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region
Medicine Bow Substation Control Building Installation Project (Amended) Carbon County, Wyoming CX(s) Applied: B4.11Date: 01/05/2015 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region
North Bonneville Substation 23- Kilovolt Line Retermination CX(s) Applied: B4.11Date: 41926 Location(s): WashingtonOffices(s): Bonneville Power Administration