Advanced High Energy Li-ion Cell for Plug-in Hybrid Electric Vehicle and Electric Vehicle Application CX(s) Applied: B3.6 Date: 07/09/2014 Location(s): Maryland Offices(s): National Energy Technology Laboratory
Routine Samples from the ARP/MCU System CX(s) Applied: B3.6Date: 41829 Location(s): South CarolinaOffices(s): Savannah River Operations Office
300-296 Waste Site Retrieval Pilot Project CX(s) Applied: B3.6 Date: 07/09/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Photonic Structures for High-Efficiency Daytime Radiative Cooling CX(s) Applied: B3.6Date: 07/08/2014 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Compact, Inexpensive Micro-Reformers for Distributed GTL CX(s) Applied: B3.6Date: 07/08/2014 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Accelerator Division Cryogenic Department Engineering Office and Meson West 9 Work Activity CX(s) Applied: B3.6Date: 41828 Location(s): IllinoisOffices(s): Fermi Site Office
PNNL Projects Involving Small-Scale Research and Development, Laboratory Operations, and Pilot Projects in the 300 Area CX(s) Applied: B3.6 Date: 07/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Achieving Hydrogen Storage Goals through High-Strength Fiber Glass CX(s) Applied: A9, B3.6 Date: 07/02/2014 Location(s): North Carolina, Pennsylvania, Nebraska, Washington Offices(s): Golden Field Office
Geomechanics Investigation of Carbon Dioxide Reservoir Seals CX(s) Applied: B3.6 Date: 07/02/2014 Location(s): Texas Offices(s): National Energy Technology Laboratory
Geomechanics investigation of Carbon Dioxide Reservoir Seals CX(s) Applied: B3.6 Date: 07/02/2014 Location(s): Utah Offices(s): National Energy Technology Laboratory