CX-014312: Categorical Exclusion Determination

Salt Batch 9 Feed Qualification CX(s) Applied: B3.6Date: 08/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

August 20, 2015
Estimated Read Time   min
Salt Batch 9 Feed Qualification
CX(s) Applied: B3.6
Date: 08/20/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office

In support of Salt Batch 9, feed material for the Actinide Removal Process (ARP) and the Modular Caustic Side Solvent Extraction Unit (MCU) must be carefully qualified before the material can be processed through those 2 units.

Document(s) Available for Download